US 45 NBL over I-65

JCT I-65 * US 45 · County 097, Alabama · Built 1962 · 3 Lanes · 9,054 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
007675
Year Built
1962
Length
91.1 m (298.9 ft)
Max Span
25 m
Width
13.8 m (45.3 ft)
Lanes
3
Daily Traffic
9,054
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,110,000
Total Project Cost
$3,421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.