US 45 over PETERSON BRANCH

0.7 MI N I-65 · County 097, Alabama · Built 1931 · 4 Lanes · 25,784 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
007204
Year Built
1931
Reconstructed
1961
Length
7.9 m (25.9 ft)
Max Span
3 m
Lanes
4
Daily Traffic
25,784
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,916,000
Total Project Cost
$4,308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.