AL 223 over BRANCH

1.0MILES N.OF PIKE COLINE · County 011, Alabama · Built 1990 · 2 Lanes · 780 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
015246
Year Built
1990
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
2
Daily Traffic
780
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$360,000
Total Project Cost
$396,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.