SR 223 MP 10.284 over CONECUH RIVER

0.5 MI. SOUTH OF SACO · County 109, Alabama · Built 1959 · 2 Lanes · 650 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
006730
Year Built
1959
Length
114 m (374 ft)
Max Span
10.4 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
650
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,357,000
Total Project Cost
$2,593,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.