AL 223 over EAST BRANCH

2.8MI.N.OF PIKE COLINE · County 011, Alabama · Built 1990 · 2 Lanes · 800 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
015248
Year Built
1990
Length
11.6 m (38.1 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
800
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$509,000
Total Project Cost
$560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.