SR 182 over PERDIDO PASS

2 MI W FLA LINE · County 003, Alabama · Built 1989 · 4 Lanes · 31,725 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
014957
Year Built
1989
Length
791.9 m (2598.1 ft)
Max Span
73.2 m
Width
26.8 m (87.9 ft)
Lanes
4
Daily Traffic
31,725
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$47,239,000
Total Project Cost
$51,963,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.