FOLEY BEACH EXPRES over INTRACOASTAL CANAL

4.8 MI. EAST HWY 59 · County 003, Alabama · Built 2000 · 2 Lanes · 16,097 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
017939
Year Built
2000
Length
566.9 m (1859.9 ft)
Max Span
91.4 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
16,097
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,326,000
Total Project Cost
$17,959,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.