RAMP E-H over 7TH * 8TH AVE NORTH

RAMP E-H OVER 7TH * 8TH · County 073, Alabama · Built 1987 · 2 Lanes · 15,241 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
014163
Year Built
1987
Length
602.9 m (1978 ft)
Max Span
33.8 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
15,241
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,949,000
Total Project Cost
$18,644,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.