RAMP ""A"" over 26TH STREET
I59 TO 26TH STREET · County 073, Alabama · Built 1987 · 1 Lanes · 15,477 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.526022, -86.802622
This bridge is in worse condition than 35.5% of bridges in County 073. The average bridge in Alabama is 0 years old; this one is 39 years old.
Nearby Bridges
RAMP ""B"" over 26TH ST AND RAMPS
Built 1987
I - 20/59 W RAMP over CITY STREETS AND US 31
Built 1987
I20E rmp/31st StN over US31 I20 Ramps RA Blvd
Built 2019
I - 20/59 SOUTH over 24TH ST BESSEMER
Built 1979
RAMP E-H over 7TH * 8TH AVE NORTH
Built 1987
I 59/20 NORTH over 24TH ST BESSEMER
Built 1979
AL - 3 NORTH over 10 TH AVE NO * RRS
Built 1987
I - 20 WB RAMP over _US31 I20 rmp RR 28thSTN
Built 2019
RAMP""C"" over 26TH STREET
Built 1987
_US31 ramp to I20W over _I20 US31 I20 ramps
Built 2019
Bridge Details
- Structure #
- 014155
- Year Built
- 1987
- Length
- 1110.1 m (3642.1 ft)
- Max Span
- 50.3 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 1
- Daily Traffic
- 15,477
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $30,446,000
- Total Project Cost
- $33,491,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.