I - 20/59 W RAMP over CITY STREETS AND US 31

RAMP FROM I59SB TO 31SB · County 073, Alabama · Built 1987 · 2 Lanes · 15,477 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
014159
Year Built
1987
Length
825.7 m (2709 ft)
Max Span
37.5 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
15,477
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,853,000
Total Project Cost
$17,438,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.