US 29 over 2ND CONECUH RIVER RELIEF

0.8 MI S CO RD 53 · County 053, Alabama · Built 1986 · 2 Lanes · 835 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013918
Year Built
1986
Length
124.4 m (408.1 ft)
Max Span
10.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
835
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,187,000
Total Project Cost
$4,606,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.