US 29 over 1ST CONECUH RIVER RELIEF

1 MI S CO RD 53 · County 053, Alabama · Built 1986 · 2 Lanes · 1,099 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
013917
Year Built
1986
Length
124.4 m (408.1 ft)
Max Span
10.4 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
1,099
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,278,000
Total Project Cost
$4,706,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.