US 29 over BRANCH

0.6 MI N CO RD 53 · County 053, Alabama · Built 1985 · 2 Lanes · 971 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
013610
Year Built
1985
Length
11.3 m (37.1 ft)
Max Span
3 m
Lanes
2
Daily Traffic
971
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$977,000
Total Project Cost
$1,075,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.