US 31 over 1st thru 8th Ave. N

US 31 * 1ST * 8TH AVE N · County 073, Alabama · Built 1972 · 3 Lanes · 36,875 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
013837
Year Built
1972
Reconstructed
1986
Length
992.7 m (3256.9 ft)
Max Span
54.9 m
Width
14.3 m (46.9 ft)
Lanes
3
Daily Traffic
36,875
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$31,994,000
Total Project Cost
$35,193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.