AL - 3 SOUTH over 5 TH AVE SO

US 31 * 5 TH AVE SO · County 073, Alabama · Built 1968 · 3 Lanes · 35,335 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
009598
Year Built
1968
Length
57.3 m (188 ft)
Max Span
21.6 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
35,335
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,645,000
Total Project Cost
$2,910,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.