AL - 3 NORTH over 6TH AVE SO

US 31 * 6TH AVE SO · County 073, Alabama · Built 1968 · 3 Lanes · 35,335 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
009597
Year Built
1968
Length
64.3 m (211 ft)
Max Span
24.4 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
35,335
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,818,000
Total Project Cost
$3,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.