CO RD 25 over TIGER BRANCH

SEABOARD · County 129, Alabama · Built 1984 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
013306
Year Built
1984
Length
43.9 m (144 ft)
Max Span
7.3 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$958,000
Total Project Cost
$1,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.