COUNTY ROAD 19 over BILBO CREEK

.5 MI. NORTH OF TOPTON · County 129, Alabama · Built 2003 · 2 Lanes · 685 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
018599
Year Built
2003
Length
62.2 m (204.1 ft)
Max Span
10.4 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
685
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,494,000
Total Project Cost
$1,643,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.