ABB RICHARDSON RD over ARMSTRONG CREEK

HOWARDTOWN · County 129, Alabama · Built 1991 · 2 Lanes · 250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
017021
Year Built
1991
Length
7.3 m (24 ft)
Max Span
7.3 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
250
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$236,000
Total Project Cost
$260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.