US 82 over BRANCH

3.6 MI.E.OF U.S.29 · County 011, Alabama · Built 1928 · 4 Lanes · 3,580 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
012251
Year Built
1928
Reconstructed
1980
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
4
Daily Traffic
3,580
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,149,000
Total Project Cost
$1,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.