US 82 EBL over BRANCH

5.4 MI.E OF U S 29 · County 011, Alabama · Built 1967 · 2 Lanes · 1,635 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
012294
Year Built
1967
Reconstructed
1980
Length
6.4 m (21 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
1,635
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$619,000
Total Project Cost
$681,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.