US 29 over C. OF GA. RR(ABAND.)

UNION SPRINGS · County 011, Alabama · Built 1953 · 4 Lanes · 3,860 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
004577
Year Built
1953
Length
38.4 m (126 ft)
Max Span
12.8 m
Width
17.7 m (58.1 ft)
Lanes
4
Daily Traffic
3,860
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,901,000
Total Project Cost
$2,091,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.