US 29 over CUBAHATCHEE CREEK

2.6 MI. N. OF US 82 JCT · County 011, Alabama · Built 1926 · 2 Lanes · 2,560 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
014321
Year Built
1926
Reconstructed
1988
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,560
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$473,000
Total Project Cost
$520,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.