CO. 1266 over WEST POINT RESERVOIR

8 MI. N.E. FREDONIA · County 017, Alabama · Built 1973 · 2 Lanes · 938 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
011017
Year Built
1973
Length
63.1 m (207 ft)
Max Span
12.8 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
938
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,512,000
Total Project Cost
$1,663,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.