CO. 1266 over WEST POINT RESERVOIR

3 MI. N. E. FREDONIA · County 017, Alabama · Built 1973 · 2 Lanes · 861 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011016
Year Built
1973
Length
56.7 m (186 ft)
Max Span
11.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
861
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,379,000
Total Project Cost
$1,517,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.