CO. 282 over STROUD CREEK

1 MI. N.E. FINLEY · County 017, Alabama · Built 1952 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017281
Year Built
1952
Reconstructed
1998
Length
12.6 m (41.3 ft)
Max Span
12.6 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$212,000
Total Project Cost
$233,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.