I65 NBL/SBL over ALABAMA RIVER AND RR

0.8 MI.S.OF AL.152 · County 101, Alabama · Built 1973 · 3 Lanes · 38,750 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
010880
Year Built
1973
Length
748 m (2454.1 ft)
Max Span
79.2 m
Width
13.6 m (44.6 ft)
Lanes
3
Daily Traffic
38,750
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$22,568,000
Total Project Cost
$24,825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.