I65 SBL * NBL over AL.RIVER RELIEF NO 1

0.8 MI.N.OF AL.RIVER · County 101, Alabama · Built 1972 · 4 Lanes · 81,240 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
010692
Year Built
1972
Length
122.5 m (401.9 ft)
Max Span
24.7 m
Width
37.4 m (122.7 ft)
Lanes
4
Daily Traffic
81,240
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,955,000
Total Project Cost
$12,051,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.