AL152-I65 RAMP D over AL.RIVER RELIEF
0.4 MI.N.OF AL.RIVER · County 101, Alabama · Built 1972 · 1 Lanes · 3,242 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.391767, -86.320253
This bridge is in worse condition than 81.2% of bridges in County 101. The average bridge in Alabama is 0 years old; this one is 54 years old.
Nearby Bridges
AL.152 EBL over ALABAMA RIVER
Built 1972
AL.152 WBL over ALABAMA RIVER
Built 1972
AL 152 WBL over I-65
Built 1972
AL 152 EBL over I-65
Built 1972
AL 152 over W.OF A RR
Built 1972
AL 152 over W OF A RR
Built 1972
AL 152 WBL over L*N RR YARD * STREETS
Built 1975
AL 152 EBL over L*N RR YARD * STREETS
Built 1975
I65 NBL / SBL over AL.RIVER RELIEF NO 2
Built 1972
I65 SBL * NBL over AL.RIVER RELIEF NO 1
Built 1972
Bridge Details
- Structure #
- 010691
- Year Built
- 1972
- Length
- 147.2 m (482.9 ft)
- Max Span
- 24.7 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 3,242
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,870,000
- Total Project Cost
- $3,157,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.