AL152-I65 RAMP D over AL.RIVER RELIEF

0.4 MI.N.OF AL.RIVER · County 101, Alabama · Built 1972 · 1 Lanes · 3,242 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
010691
Year Built
1972
Length
147.2 m (482.9 ft)
Max Span
24.7 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
3,242
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,870,000
Total Project Cost
$3,157,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.