I65 NBL / SBL over AL.RIVER RELIEF NO 2

1.2 MI.N.OF AL.RIVER · County 101, Alabama · Built 1972 · 6 Lanes · 40,620 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
010694
Year Built
1972
Reconstructed
1999
Length
145.1 m (476 ft)
Max Span
10.4 m
Width
38.3 m (125.7 ft)
Lanes
6
Daily Traffic
40,620
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,109,000
Total Project Cost
$14,420,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.