I65 NBL/SBL over AL.RIVER RELIEF NO.3
1.6 MI.N.OF AL.RIVER · County 101, Alabama · Built 1972 · 6 Lanes · 40,620 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.39895, -86.334781
This bridge is in worse condition than 57.1% of bridges in County 101. The average bridge in Alabama is 0 years old; this one is 54 years old.
Nearby Bridges
I65 NBL/SBL over AL.RIVER RELIEF NO.4
Built 1972
I65 NBL / SBL over AL.RIVER RELIEF NO 2
Built 1972
I65 NBL/SBL over AL.RIVER RELIEF NO 5
Built 1972
I65 SBL over AL.RIVER RELIEF NO 6
Built 1972
AL 152 WBL over I-65
Built 1972
AL 152 EBL over I-65
Built 1972
AL0601 (OLD AL143) over CSX RAIL ROAD
Built 1937
AL152-I65 RAMP D over AL.RIVER RELIEF
Built 1972
AL.152 WBL over ALABAMA RIVER
Built 1972
AL.152 EBL over ALABAMA RIVER
Built 1972
Bridge Details
- Structure #
- 010696
- Year Built
- 1972
- Reconstructed
- 1999
- Length
- 82.9 m (272 ft)
- Max Span
- 10.4 m
- Width
- 38.3 m (125.7 ft)
- Lanes
- 6
- Daily Traffic
- 40,620
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,961,000
- Total Project Cost
- $8,757,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.