CO.RD. 40 over I85

1.48 MI.N.OF SHORTER EXIT · County 087, Alabama · Built 1962 · 2 Lanes · 1,210 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

32.417653, -85.942747

This bridge is in worse condition than 74.4% of bridges in County 087. The average bridge in Alabama is 0 years old; this one is 64 years old.

Nearby Bridges

Bridge Details

Structure #
007558
Year Built
1962
Length
106.7 m (350.1 ft)
Max Span
29.3 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
1,210
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,222,000
Total Project Cost
$2,444,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.