I85 SBL over CUBAHATCHEE CREEK

2.5 MI.N.OF MONTG.CO.LINE · County 087, Alabama · Built 1961 · 2 Lanes · 18,020 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
007267
Year Built
1961
Length
129.2 m (423.9 ft)
Max Span
15.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
18,020
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,110,000
Total Project Cost
$3,421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.