AL 138 over I85

SHORTER EXIT · County 087, Alabama · Built 1961 · 2 Lanes · 3,480 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
007269
Year Built
1961
Length
80.8 m (265.1 ft)
Max Span
22.3 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
3,480
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,056,000
Total Project Cost
$2,262,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.