HOLT RD over PINEY CR

SEC7 T2S R3W · County 083, Alabama · Built 1961 · 2 Lanes · 513 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
007465
Year Built
1961
Length
18.9 m (62 ft)
Max Span
9.4 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
513
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$431,000
Total Project Cost
$474,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.