BLACK RD over PINEY CR

SEC13 T2S R3W · County 083, Alabama · Built 1957 · 2 Lanes · 1,260 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

34.861789, -86.906822

This bridge is in worse condition than 61.2% of bridges in County 083. The average bridge in Alabama is 0 years old; this one is 69 years old.

Nearby Bridges

Bridge Details

Structure #
006001
Year Built
1957
Length
72.5 m (237.9 ft)
Max Span
10.4 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
1,260
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,306,000
Total Project Cost
$1,437,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.