SR 251 over BRANCH

4.4 M N JCT SR251 & I 65 · County 083, Alabama · Built 1926 · 2 Lanes · 5,510 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
009482
Year Built
1926
Reconstructed
1968
Length
14 m (45.9 ft)
Max Span
4.9 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
5,510
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$584,000
Total Project Cost
$642,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.