WOOLEY SPRINGS RD over Gravel Branch

SEC31 T1S R3W · County 083, Alabama · Built 1941 · 2 Lanes · 235 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
002605
Year Built
1941
Length
7.6 m (24.9 ft)
Max Span
7 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
235
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$193,000
Total Project Cost
$212,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.