AL - 5 (US 78) over SOU * L * N RR

.2 MI.WEST DIV OFFICE · County 073, Alabama · Built 1936 · 4 Lanes · 45,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
001393
Year Built
1936
Length
108.2 m (355 ft)
Max Span
22.3 m
Width
16.2 m (53.1 ft)
Lanes
4
Daily Traffic
45,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,258,000
Total Project Cost
$4,684,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.