AL - 4 (US 78) over BRANCH

.9 MI. E. AL 25 · County 073, Alabama · Built 1928 · 2 Lanes · 4,260 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000471
Year Built
1928
Length
9.8 m (32.2 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
4,260
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$304,000
Total Project Cost
$334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.