NO NAME ST over BRANCH

0.6 MI E OF AL 119 · County 073, Alabama · Built 1985 · 2 Lanes · 300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
020894
Year Built
1985
Length
7.3 m (24 ft)
Max Span
7.3 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$255,000
Total Project Cost
$281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.