I 20 over LITTLE CAHABA RIVER

.1 MI.W.US 411 · County 115, Alabama · Built 1961 · 8 Lanes · 65,150 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
007214
Year Built
1961
Reconstructed
2003
Length
11.6 m (38.1 ft)
Max Span
3.7 m
Lanes
8
Daily Traffic
65,150
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,004,000
Total Project Cost
$2,204,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.