Go Cnty Rd 51C over Cherry Creek Drainage

Apx 1 Mi E Of Torrington · County 015, Wyoming · Built 1993 · 2 Lanes · 277 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
IXU
Year Built
1993
Length
19.8 m (65 ft)
Max Span
9.8 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
277
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$18,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.