Go Cnty Rd 66B over Cherry Creek Drainage

3.5 Mi. Sw Of Torrington · County 015, Wyoming · Built 1975 · 2 Lanes · 69 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
EZG
Year Built
1975
Length
31.1 m (102 ft)
Max Span
11.9 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
69
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$8,000
Total Project Cost
$41,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.