Ln Cnty Rd 125 over Salt River
0.5 Miles W. Of Thayne · County 023, Wyoming · Built 1980 · 2 Lanes · 158 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
42.924686, -111.017206
This bridge is in worse condition than 43.4% of bridges in County 023. The average bridge in Wyoming is 0 years old; this one is 46 years old.
Nearby Bridges
US 89 over Etna Irrigation Canal
Built 1969
US 89 over Etna Irrigation Canal
Built 1994
Ln Cnty Rd 125 over East Side Canal
Built 1979
Ln Cnty Rd 173S over East Side Canal
Built 2006
US 89 over Etna Irrigation Canal
Built 1960
WYO 239 over Salt River
Built 1953
US 89 over Salt River
Built 1960
US 89 over Salt River
Built 1960
Ln Cnty Rd 126 over Strawberry Creek
Built 2001
Ln Cnty Rd 128 over Willow Creek
Built 1998
Bridge Details
- Structure #
- EQN
- Year Built
- 1980
- Length
- 33.5 m (109.9 ft)
- Max Span
- 13 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 158
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,000
- Total Project Cost
- $6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.