US 89 over Salt River
Afton - Alpine Jct · County 023, Wyoming · Built 1960 · 2 Lanes · 7,033 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.869811, -110.983139
This bridge is in worse condition than 43.4% of bridges in County 023. The average bridge in Wyoming is 0 years old; this one is 66 years old.
Nearby Bridges
US 89 over Salt River
Built 1960
Ln Cnty Rd 128 over Willow Creek
Built 1998
US 89 over Etna Irrigation Canal
Built 1960
WYO 238 over Salt River
Built 1964
Ln Cnty Rd 173S over East Side Canal
Built 2006
Ln Cnty Rd 125 over East Side Canal
Built 1979
Ln Cnty Rd 134 over Stump Creek
Built 1988
US 89 over Etna Irrigation Canal
Built 1994
Ln Cnty Rd 126 over Strawberry Creek
Built 2001
US 89 over Etna Irrigation Canal
Built 1969
Bridge Details
- Structure #
- BOD
- Year Built
- 1960
- Length
- 41.8 m (137.1 ft)
- Max Span
- 13.1 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 7,033
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.