Hereford Lane over I-25
Casper Marginal · County 025, Wyoming · Built 1960 · 2 Lanes · 136 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
42.855547, -106.291775
This bridge is in worse condition than 96.3% of bridges in County 025. The average bridge in Wyoming is 0 years old; this one is 66 years old.
Nearby Bridges
US 20/26/87 over I-25
Built 1968
N Beverly Street over I-25
Built 1960
I-25 NBL and SBL over Walsh Drive
Built 2022
I-25 NBL over North McKinley Street
Built 1958
I-25 SBL over North McKinley Street
Built 1958
I-25 NBL over WYO 258 (Wyoming Blvd)
Built 2006
I-25 SBL over WYO 258 (Wyoming Blvd)
Built 2007
I-25 NBL and SBL over Center Street
Built 2024
Bryan Stock Trail over North Platte River
Built 1982
VeteransCemeteryRd over North Platte River
Built 1985
Bridge Details
- Structure #
- BMA
- Year Built
- 1960
- Length
- 27.4 m (89.9 ft)
- Max Span
- 26.2 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 2
- Daily Traffic
- 136
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.