N Beverly Street over I-25
Casper Marginal · County 025, Wyoming · Built 1960 · 4 Lanes · 9,603 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.857472, -106.297597
This bridge is in worse condition than 77% of bridges in County 025. The average bridge in Wyoming is 0 years old; this one is 66 years old.
Nearby Bridges
Hereford Lane over I-25
Built 1960
US 20/26/87 over I-25
Built 1968
I-25 SBL over North McKinley Street
Built 1958
I-25 NBL over North McKinley Street
Built 1958
I-25 NBL and SBL over Walsh Drive
Built 2022
I-25 NBL and SBL over Center Street
Built 2024
I-25 NBL over WYO 258 (Wyoming Blvd)
Built 2006
I-25 SBL over WYO 258 (Wyoming Blvd)
Built 2007
W F Street over North Platte River
Built 2024
I-25 NBL and SBL over North Platte River
Built 2024
Bridge Details
- Structure #
- AIB
- Year Built
- 1960
- Length
- 29.3 m (96.1 ft)
- Max Span
- 28 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 4
- Daily Traffic
- 9,603
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $177,000
- Total Project Cost
- $265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.