FIREHOLE LAKE DRIV over THERMAL AREA DRAINAGE

10 +/- MI. SOUTH OF MADIS · County 039, Wyoming · Built 1935 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
1570062P0000000
Year Built
1935
Length
8.7 m (28.5 ft)
Max Span
1.5 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
1,500
Material
Wood or Timber
Design
Slab
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$475,000
Total Project Cost
$790,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.