GRAND LOOP ROAD over FIREHOLE RIVER

14.6 MI. SOUTH OF MADISON · County 039, Wyoming · Built 1967 · 2 Lanes · 1,807 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1570011P0000000
Year Built
1967
Length
31.1 m (102 ft)
Max Span
20.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,807
Material
Concrete Continuous
Design
Tee Beam
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$135,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.